Skip to content
Up to $3,000 OFF + FREE 3D design
ABC Kitchen & Bath Remodeling logo
Remodeled white shaker kitchen with oversized granite island, stainless range hood and wide-plank flooring

Kitchen remodeling guide

Kitchen Remodeling: A Step-by-Step Guide for Homeowners

Everything we explain to homeowners before a kitchen remodel — in one place.

  • 6 min read
  • Updated October 16, 2026
  • By the ABC design team
4.7

Google rating · Since 2010

  • Best of Houzz 2022 Design award
  • Best of Houzz 2021 Design award
  • Best of Houzz 2021 Service award
  • Best of Houzz 2020 Design award
  • Best of Houzz 2019 Service award
  • Angi Super Service Award 2020
  • Angie's List Super Service Award 2019

Quick answer

A kitchen remodel updates or reconfigures a kitchen’s cabinets, countertops, flooring, lighting, plumbing and appliances. Most full remodels move through planning, design, selections and ordering, permits, and construction. Expect a few weeks of design, material lead times (cabinets are usually the longest), and roughly 4–8 weeks of construction for a full kitchen. The biggest cost drivers are layout changes, cabinet grade and countertop material.

At a glance

Typical phases
Plan → design → select & order → permits → build
Design and selections
Usually a few weeks
Construction (full kitchen)
About 4–8 weeks once materials arrive
Longest lead item
Cabinets
Biggest way to save
Keep the sink, range and refrigerator where they are
Permits
Usually required for plumbing, electrical, gas or wall changes

Types of kitchen remodels

“Kitchen remodeling” covers everything from new countertops to a full gut-and-rebuild. Knowing which type you need is the first step to a realistic budget.

Cosmetic refreshPaint, hardware, backsplash, lighting, sometimes countersSolid cabinets and a layout that works
Replace in placeNew cabinets, counters, flooring and appliances; plumbing staysDated kitchens with a functional layout
Full remodel with new layoutWalls removed, sink or range moved, island addedClosed or inefficient kitchens
Remodel plus additionKitchen expands into new or borrowed spaceHomes that simply need more room

The kitchen remodeling process in 8 steps

  1. Define goals and budget

    List what isn’t working today, what you want to add, and a budget range you’re comfortable with — including a contingency for surprises behind the walls.

  2. Measure and assess

    A designer measures the room and checks walls, plumbing, venting and the electrical panel. This decides what’s easy to change and what isn’t.

  3. Design the layout in 3D

    Workflow, clearances, storage and seating come first. A 3D rendering lets you test ideas before anything is ordered.

  4. Choose cabinets

    Cabinet line, door style, finish and interior storage — the decision that shapes both the look and the budget most.

  5. Choose surfaces

    Countertops, backsplash and flooring, selected together so colors and patterns work as a whole.

  6. Plan lighting, electrical and appliances

    Recessed, pendant and under-cabinet lighting, outlet locations and exact appliance models (cutout sizes matter).

  7. Permits and schedule

    Drawings are submitted for permits and a written schedule is set before demolition.

  8. Construction and walkthrough

    Demolition, rough-ins and inspections, cabinets, countertops, tile, fixtures — then a final walkthrough and punch list.

Choosing a kitchen layout

The right layout depends on the room’s shape, where the windows and doors are and how many people cook at once. NKBA planning guidelines recommend work aisles of at least 42 inches for one cook and 48 inches for two or more.

L-shaped

Two adjoining walls — flexible, open and easy to pair with an island.

U-shaped

Three walls of cabinets for maximum storage and counter space; needs width to avoid feeling cramped.

Galley

Two parallel runs — very efficient for one cook and common in townhouses and older homes.

Island

Adds prep space, storage and seating. Plan about 24 inches of width per seat.

Peninsula

An island connected to the cabinetry — ideal when there isn’t room for clearance on all sides.

One-wall

Everything on a single wall — great for small spaces, often paired with an island.

Countertop materials compared

Countertops take daily abuse, so choose for how you cook, not just how it looks. See our countertop options for samples and colors.

QuartzNon-porous, consistent color, very low maintenanceExcess heat can damage the resin — use trivets
GraniteNatural stone, heat- and scratch-resistant, every slab uniqueNeeds periodic sealing
QuartziteVery hard natural stone with a marble-like lookNeeds sealing; typically a premium price
MarbleTimeless veining and a cool surface for bakingEtches and stains more easily
Butcher blockWarm, inviting and easy to refinishNeeds oiling; keep water away from seams

For cabinets, the key decisions are the cabinet line (stock, semi-custom or custom), box construction and drawer hardware. Our kitchen cabinet guide explains how to judge quality in a showroom.

What drives kitchen remodeling cost

There is no honest one-size price for a kitchen remodel, but the same factors drive cost in every project:

  • Layout changes — moving plumbing, gas or walls adds trades, inspections and time.
  • Cabinets — usually the single largest line item; stock, semi-custom and custom lines differ substantially.
  • Countertops — priced by material, number of slabs, edge profile and cutouts.
  • Structural and mechanical work — beams for open layouts, panel upgrades, relocated ductwork.
  • Appliances and fixtures — pro-style ranges, panel-ready refrigerators and designer faucets add up quickly.

Save where it doesn’t show: keep the plumbing wall, choose a semi-custom line with good boxes and drawers, and put your splurge into the pieces you touch every day. Ask for an itemized proposal so you can compare scope line by line. Unlock your savings →

How long does a kitchen remodel take?

Design and selectionsA few weeks, depending on how quickly decisions are made
Cabinet lead timeDays for stock lines; several weeks for semi-custom and custom
PermitsVaries by county, city or town
ConstructionAbout 4–8 weeks for a full kitchen
CountertopsTemplated after cabinets; about 1–2 weeks to fabricate, usually one day to install

Common kitchen remodeling mistakes to avoid

  • Choosing finishes before the layout is settled
  • Too few drawers and too little landing space beside appliances
  • Relying on one ceiling light instead of layered lighting
  • Not enough outlets — especially on the island
  • Picking appliances after the cabinets are ordered
  • A range hood that recirculates instead of venting outside
  • No contingency for hidden damage
  • Hiring on the lowest bid instead of a clear, complete scope

Kitchen remodeling in Northern Virginia

ABC Kitchen & Bath has designed and built kitchens across Northern Virginia since 2010, from our showroom in Chantilly. If you’re local, see our kitchen remodeling services, our guide to kitchen remodeling in Chantilly, VA, and how to choose the best kitchen remodeler.

Our work

Kitchen remodel inspiration

Real projects designed and built by our team.

View all projects
Bright white kitchen with a large island, glass globe pendants and stainless appliances
Kitchen · Bright white kitchen
Traditional cream kitchen with glass-front cabinets, red painted island and butcher-block top
Kitchen · Traditional cream kitchen
Custom kitchen with granite island, decorative tile backsplash and built-in range hood
Kitchen · Custom kitchen
White kitchen with gray island, marble countertops and stainless steel appliances
Kitchen · White kitchen
White kitchen cabinets paired with a walnut-stained island and farmhouse pendant lights
Kitchen · White kitchen cabinets paired

Reviews

Homeowners love working with us

Rated 4.7 out of 5 on Google by 78+ Northern Virginia homeowners.

Read all reviews
Google review
“This was my first time remodeling anything. I hired ABC for a kitchen remodel. They designed a beautiful kitchen with a huge island. I didn’t have an island before and I love how it all came out. They were patient with me with choosing all the material.”
BW Brittany WolcottKitchen remodel
Google review
“ABC Kitchen & Bath did a phenomenal job with remodeling 1 bathroom and 1 powder room. They provided great results/value at a reasonable cost. Hakan and his team provided excellent customer service from the beginning phase through final installation.”
JA Jim AreklettBathroom + powder room
Google review
“The fellows that installed my new cabinets were professional and cared about their craftsmanship. Easy to work with. They take care of everything from start to finish. I can easily and highly recommend.”
WW Wittney WinickiCabinet installation

Offer ends this month

Get up to $3,000 OFF your kitchen remodel

Unlock your benefits and a designer will reach out to schedule a free consultation at your home or our Chantilly showroom.

4.7/5 on Google (703) 498-2121

Unlock your benefits

Takes 30 seconds · No obligation

Your information stays private. No spam, ever.

FAQ

Kitchen Remodeling Guide — FAQ

Can’t find your answer? Call us — a real person picks up.

(703) 498-2121
What is the first step in a kitchen remodel?

Define what isn’t working and set a budget range, then have a designer measure and assess the room. The layout should be settled before you choose cabinets, counters or finishes.

Is it cheaper to keep the same kitchen layout?

Yes. Keeping the sink, range and refrigerator in place avoids most plumbing, gas and electrical relocation costs — and new cabinets, counters, lighting and flooring can still transform the room.

What is the most low-maintenance countertop?

Quartz is the most low-maintenance option for most families: it is non-porous and never needs sealing. Granite is a close second and handles heat better, but should be sealed periodically.

Can I live in my house during a kitchen remodel?

Most homeowners do. The work area is sealed against dust, and many families set up a temporary kitchen with a sink, microwave and refrigerator elsewhere in the house.

Should I choose appliances before the kitchen is designed?

Choose the models during design. Cabinet openings, ventilation and electrical are planned around exact appliance dimensions, so late changes can force costly rework.

Offer ends this month

Don’t miss up to $3,000 OFF your remodel.

Ends this month

Up to $3,000 OFF

your kitchen or bathroom remodel

+ FREE 3D design, in-home estimate & financing

Unlock your benefits in 30 seconds

No obligation. We never share your information.

Prefer to talk? (703) 498-2121