Skip to content
Up to $3,000 OFF + FREE 3D design
ABC Kitchen & Bath Remodeling logo
Modern bathroom with floating white vanity, large-format tile and tub-shower combo

Chantilly bathroom guide

Bathroom Remodeling in Chantilly, VA

Showers, tubs, vanities and tile — how we remodel bathrooms in Chantilly homes, and what to expect.

  • 5 min read
  • Updated October 16, 2026
  • By the ABC design team
4.7

Google rating · Since 2010

  • Best of Houzz 2022 Design award
  • Best of Houzz 2021 Design award
  • Best of Houzz 2021 Service award
  • Best of Houzz 2020 Design award
  • Best of Houzz 2019 Service award
  • Angi Super Service Award 2020
  • Angie's List Super Service Award 2019

Quick answer

ABC Kitchen & Bath remodels bathrooms throughout Chantilly, VA from our showroom at 14220 Sullyfield Cir, Unit D, Chantilly, VA 20151. We handle the design, Fairfax County permits, plumbing, waterproofing, tile and glass with one project manager. Once materials are on site, most hall bathrooms take about 2–3 weeks and larger primary bathrooms about 3–5 weeks of construction.

At a glance

Showroom
14220 Sullyfield Cir, Unit D, Chantilly, VA 20151
Most requested
Tub-to-shower conversions, primary suites, hall baths
Construction time
About 2–3 weeks (hall bath) · 3–5 weeks (primary bath)
Permits
Fairfax County Land Development Services
Design
Free 3D rendering with a signed remodel contract
Financing
Finance by Cambria, on approved credit

Bathroom remodeling projects we do most in Chantilly

Tub-to-shower conversions

The fiberglass tub-shower in many 1990s and 2000s homes becomes a tiled walk-in shower with frameless glass, a niche and an optional bench.

Primary bathroom suites

Oversized corner tubs give way to a large walk-in shower, a double vanity with real storage and better lighting.

Hall and kids’ baths

Durable porcelain tile, easy-clean surfaces and a tub kept for bath time where it makes sense.

Powder rooms

A statement vanity, wallpaper or tile accent wall and new lighting — small space, big first impression.

Basement bathrooms

New full or half baths, including plumbing rough-in and properly vented exhaust.

Aging-in-place bathrooms

Curbless showers, grab bars, comfort-height toilets, handheld showers and slip-resistant tile.

What we often find behind Chantilly bathroom walls

Chantilly’s housing ranges from late-1960s and 1970s homes in Greenbriar and Brookfield to 1990s–2000s single-family homes and townhouses. Each era has its own surprises once demolition starts:

  • Older homes can have aging supply lines and drains, tile set directly on drywall, and subfloor damage around the toilet or tub from slow leaks.
  • 1990s–2000s homes usually have one-piece fiberglass tub-showers, builder-grade vanities and exhaust fans too small for the room — sometimes venting into the attic instead of outdoors.
  • Townhouses often share walls and plumbing stacks, which affects noise control and where fixtures can move.

We inspect framing, plumbing and subfloor as soon as the walls are open and show you anything that needs attention before we close them up, so problems are fixed rather than tiled over.

Why waterproofing matters more than the tile you pick

Tile and grout are not waterproof on their own. What keeps water out of your walls and subfloor is the system behind the tile: a sloped shower pan and a continuous waterproof membrane on the walls and floor of the shower. We flood-test shower pans before tile goes on.

Two other details make a bathroom last: an exhaust fan sized for the room and ducted outdoors (a common guideline is about 1 CFM per square foot for bathrooms up to 100 square feet), and GFCI-protected outlets. Curbless showers also need the floor framing planned for a recessed pan and a linear or properly sloped drain.

Bathroom with marble shower, frameless glass and matte black fixtures
Marble-look shower with frameless glass and matte black fixtures — the waterproofing behind the tile is what makes it last.

Our Chantilly bathroom remodeling process

  1. Consultation and measurements

    At home or in our Chantilly showroom. We note what works, what doesn’t, and how the bathroom is used every day.

  2. 3D design

    See the layout, tile and vanity in a photo-realistic rendering and make changes before anything is ordered.

  3. Selections in the showroom

    Choose vanities, tile, fixtures, glass and lighting in person.

  4. Permits and ordering

    We file Fairfax County permits and order everything before demolition to keep the bathroom out of service for as short a time as possible.

  5. Demolition and rough-in

    Remove old finishes, inspect framing and subfloor, then rough in plumbing, electrical and ventilation for inspection.

  6. Waterproofing and tile

    Shower pan, membrane, flood test, then floor and wall tile.

  7. Finishes and walkthrough

    Vanity, fixtures, glass, paint and accessories — followed by a final walkthrough with you.

Bathroom remodel cost factors and timelines

Bathroom pricing depends mainly on size, whether fixtures move, the amount and type of tile, the vanity and countertop, and the glass enclosure. Here is how the most common Chantilly projects compare:

Tub-to-shower conversionRemove tub, new shower pan, waterproofing, tile, glassAbout 1–2 weeks
Hall bathroomFull remodel in the existing layoutAbout 2–3 weeks
Primary bathroomLarger shower, double vanity, often a layout changeAbout 3–5 weeks

*Once materials are on site, including inspections and tile curing time.

Every homeowner receives an itemized proposal after a free consultation. Qualifying projects currently save up to $3,000. Unlock your savings →

Remodeling your only full bathroom

Many Chantilly townhouses and smaller homes have just one full bathroom. If that’s you, tell us at the first meeting. We order every fixture and finish before demolition, sequence the work to keep the downtime short, and plan around your family’s schedule. Need to compare companies first? Read how to choose a bathroom remodeling company in Chantilly.

Chantilly neighborhoods and nearby areas

We remodel bathrooms across Chantilly — Greenbriar, Brookfield, Poplar Tree, Pleasant Valley and the Sully area — and nearby in Centreville, South Riding, Herndon and Fairfax. Remodeling the kitchen as well? See our Chantilly kitchen remodeling guide or explore walk-in showers and tub-to-shower conversions.

Our work

Bathrooms we’ve remodeled

Real projects designed and built by our team.

View all projects
Walk-in shower with blue hexagon accent tile, marble walls and built-in soaking tub
Bathroom · Walk-in shower
White double vanity with makeup station, quartz top and marble-look floor tile
Bathroom · White double vanity
Luxury primary bathroom with glass-enclosed shower, chandelier and freestanding tub
Bathroom · Luxury primary bathroom
Marble walk-in shower with LED niche lighting and freestanding tub
Bathroom · Marble walk-in shower
Glass shower enclosure with bench next to a freestanding tub
Bathroom · Glass shower enclosure

Reviews

Homeowners love working with us

Rated 4.7 out of 5 on Google by 78+ Northern Virginia homeowners.

Read all reviews
Google review
“This was my first time remodeling anything. I hired ABC for a kitchen remodel. They designed a beautiful kitchen with a huge island. I didn’t have an island before and I love how it all came out. They were patient with me with choosing all the material.”
BW Brittany WolcottKitchen remodel
Google review
“ABC Kitchen & Bath did a phenomenal job with remodeling 1 bathroom and 1 powder room. They provided great results/value at a reasonable cost. Hakan and his team provided excellent customer service from the beginning phase through final installation.”
JA Jim AreklettBathroom + powder room
Google review
“The fellows that installed my new cabinets were professional and cared about their craftsmanship. Easy to work with. They take care of everything from start to finish. I can easily and highly recommend.”
WW Wittney WinickiCabinet installation

Offer ends this month

Get up to $3,000 OFF your bathroom remodel

Unlock your benefits and a designer will reach out to schedule a free consultation at your home or our Chantilly showroom.

4.7/5 on Google (703) 498-2121

Unlock your benefits

Takes 30 seconds · No obligation

Your information stays private. No spam, ever.

FAQ

Bathroom Remodeling in Chantilly, VA — FAQ

Can’t find your answer? Call us — a real person picks up.

(703) 498-2121
How long does a bathroom remodel take in Chantilly?

Once materials are on site, most hall bathrooms take about 2–3 weeks and primary bathrooms about 3–5 weeks of construction, including inspections and tile curing. Tub-to-shower conversions usually take about 1–2 weeks.

Can you convert my bathtub into a walk-in shower?

Yes. Tub-to-shower conversions are one of our most popular Chantilly projects. We remove the tub, build a waterproofed shower pan and install tile, glass, a niche and a bench if you want one.

Do you pull bathroom remodeling permits in Fairfax County?

Yes. We prepare and file the required plumbing, electrical and building permits with Fairfax County Land Development Services and schedule every inspection.

Can I see tile and vanities before I decide?

Yes. Visit our showroom at 14220 Sullyfield Cir, Unit D, Chantilly, VA 20151 to compare vanities, tile, fixtures and lighting with a designer.

Do you build curbless or accessible showers?

Yes. We design curbless showers, grab bars, comfort-height toilets, handheld showers and slip-resistant floors that look great and keep you safe.

Offer ends this month

Don’t miss up to $3,000 OFF your remodel.

Ends this month

Up to $3,000 OFF

your kitchen or bathroom remodel

+ FREE 3D design, in-home estimate & financing

Unlock your benefits in 30 seconds

No obligation. We never share your information.

Prefer to talk? (703) 498-2121