Complete bathroom remodels from a single team
ABC Kitchen & Bath designs, furnishes and installs everything a complete bathroom remodel needs. We handle permits, inspections, demolition, plumbing, electrical, ventilation, waterproofing, tile and finishing — so you deal with one company and one project manager instead of a string of subcontractors.
Before construction begins, you’ll see your new bathroom in a 3D rendering and choose vanities, tile, fixtures and lighting in our Chantilly showroom. No guesswork, no surprises.
Bathrooms we remodel
Primary bathrooms
Spa-style suites with walk-in showers, freestanding tubs, double vanities and heated floors.
Hall & kids’ baths
Durable, easy-clean tile and smart storage built for busy families.
Powder rooms
Small spaces with big impact — statement vanities, wallpaper and lighting.
Basement bathrooms
New full or half baths, including plumbing rough-in and proper ventilation.
Aging-in-place baths
Curbless showers, grab bars, comfort-height toilets and slip-resistant tile.
Tub-to-shower conversions
Swap an unused tub for a roomy walk-in shower with glass and a bench.
What’s included
- Design consultation and 3D rendering
- Demolition, disposal and job-site protection
- Plumbing re-routing and new fixtures
- Waterproofed shower systems
- Floor and wall tile installation
- Vanities, countertops and mirrors
- Frameless glass shower enclosures
- Lighting, exhaust fans and outlets
- Built-in niches, benches and storage
- Permits, inspections and final cleanup
Bathroom remodel cost factors
Bathroom pricing depends mainly on size, whether fixtures move, the amount and type of tile, the vanity and countertop selection, and glass enclosures. A powder room refresh and a full primary suite are very different projects — which is why we give every homeowner an itemized proposal after a free consultation. Unlock your savings →
How long does a bathroom remodel take?
Once materials are on site, most hall bathrooms take about 2–3 weeks and larger primary bathrooms about 3–5 weeks of construction, including inspections and tile curing time. We order everything before demolition so your bathroom is out of commission for as short a time as possible.







